Project Manager Dan Moors

Scope of Work​

Fairness Formula Projects - $34,492

The School Site Improvement Committee identified fairness formula projects — a list of recommended projects. The list will be prioritized and completed as budget allows.

  • Exterior Improvements 
    • Install outdoor physical education facilities
    • Create garden / greenhouse space
    • Install additional boulders to protect parking lot
    • Purchase portable storage
  • Fencing - Replace aged fence
  • Create dedicated library space

Technology Infrastructure

  • Replace hardware that enables wired and wireless connections to the Internet.

Aspen Valley High School

1450 Chapel Hills Dr.,Colorado Springs

visit website

Project Details

Project Manager

Dan Moors

​Scope of Work

Remodels/Additions - $480.000

  • Remodels / Additions - Construct a student lunchroom

Fairness Formula Projects - $62,924

The School Site Improvement Committee identified fairness formula projects — a list of recommended projects. The list will be prioritized and completed as budget allows.
  • Flooring - Replace Multipurpose Room flooring and install new bleachers
  • Furniture, Fixtures, and Equipment - Install turf on the field between AVHS and Bridges
  • Hydration Stations - Install hydration stations (replace existing drinking fountains)
  • Renovate basement to create instructional space
  • Install storage space / lockers for student backpacks

Facilities Audit - $28,000

  • HVAC Controls - DDC upgrades

Technology Infrastructure

  • Replace hardware that enables wired and wireless connections to the Internet 

​In Progress

Remodels / Additions

  • Lunchroom addition: Design meetings in progress. Work scheduled to begin summer 2019 

Facilities Audit

  • Boiler replacement: Work scheduled to be done over summer 2019